How charging time is calculated
AC (Level 1 & 2): power = the lower of the charger's output (volts × amps) and your car's onboard charger. Time = energy needed ÷ (power × charging efficiency). Above 90% the car tapers, so we model the last stretch at 70% of full power.
DC fast charging: we integrate in 0.5% steps across a generic charging curve — peak power around 10%, about 85% of peak at 20%, half of peak by 50%, roughly 28% at 80% and 8% at 100% — capped by the station's output. That averages about 55–60% of peak power for a 10→80% session, in line with published charging tests. Real curves vary by model, temperature and battery preconditioning.
Level 2 charger power by amperage
| Charger current | Power at 240 V | Breaker needed | Typical range added / hour |
|---|---|---|---|
| 16 A | 3.8 kW | 20 A | 12–15 mi |
| 32 A | 7.7 kW | 40 A | 25–30 mi |
| 40 A | 9.6 kW | 50 A | 30–37 mi |
| 48 A | 11.5 kW | 60 A | 37–44 mi |
Planning an install? Size the circuit with the EV charger breaker & wire size calculator and read 32A vs 40A vs 48A: which does your car actually use?
Formulas, assumptions and data sources are documented on our methodology page. Results are estimates; your utility bill and vehicle may differ.